Thursday, June 10, 2021
  • About Us
  • ImagiNATION
  • Adverts
  • Rate Card
  • Contact Us
The Nation Online
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Life & Style
    • Every Woman
      • Soul
      • Family
    • Religion
    • Feature
  • Society
  • Opinion
  • Sports
  • Chichewa
  • Enation
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Life & Style
    • Every Woman
      • Soul
      • Family
    • Religion
    • Feature
  • Society
  • Opinion
  • Sports
  • Chichewa
  • Enation
No Result
View All Result
No Result
View All Result
Home News National News

Cama slams Escom on prolonged blackouts

by Andrew Nyondo
20/03/2018
in National News
2 min read
0
Share on FacebookShare on TwitterShare on WhatsAppShare on LinkedinLinkedinShare via Email

 

Consumers Association of Malawi (Cama) has taken a swipe at Electricity Generation Company (Egenco) and Electricity Supply Corporation of Malawi (Escom) for extended load shedding despite the provision of diesel generators.

In an interview yesterday, Cama executive director John Kapito said the country is sailing through troubled waters despite having diesel generators which were expected to reduce load shedding hours to a maximum of six hours per day.

escom genset | The Nation Online
Some of the generators that Escom hired

He said: “Instead of moving to a better level we are going backwards, and this is coming at a time when consumers have accepted high electricity tariffs which Mera [Malawi Energy Regulatory Authority] approved.”

The reaction follows Escom’s request for Ministry of Agriculture, Irrigation, Water and Development to increase the level of water flow in Shire River to allow Egenco generate enough megawatts (MW) for power supply.

The letter, signed by the corporation’s chief executive officer Allexon Chiwaya, argues that the Ministry of Agriculture, Irrigation and Water Development recently decided to reduce the flow of water to 110 cubic metres, a decision the corporation wants reversed until end May this year.

According to the letter, Egenco is supplying 170MW instead of 220MW from the hydro generation, creating a deficit of 50MW and leading to prolonged load shedding of 10 hours per day for domestic customers and two days per week for industrial customers.

But in a separate interview, Egenco senior public relations officer Moses Gwaza said it is not Escom’s responsibility to request the ministry for increased water flow.

He said: “Egenco was negotiating for the water through its own mechanisms. You may wish to know that the issue of water is not for Escom but rather a responsibility of Egenco.

“I am pleased to say that by Saturday, we obtained the approval to increase the flows to 120 cubic meters per second. With the increased water flows we expect to have normal supply with the load shedding as previously implemented by Escom.”

But in her remarks, political commentator Emily Mkamanga blamed the two institutions for opting for a short-term solution to ending blackouts.

It is expected that 20MW will be added to the national grid from Zambia Electricity Supply Corporation (Zesco) and another 23MW from Aggreko which will plant its machines at Chinyama.

 

Anonymous Calligraphy | The Nation Online
Andrew Nyondo
Previous Post

Intellectual rights support economic growth—Tembenu

Next Post

Pen Malawi honours Professor David Rubadiri

Related Posts

At the helm: Chizuma
National News

ACB stops nocma Fuel supply deals

June 10, 2021
Dismissed assertions: Kasaila
National News

MEC reconstituted with fewer women

June 10, 2021
chakwera 9 | The Nation Online
National News

Chakwera hails PAC on Covid-19 response

June 10, 2021
Next Post
To be accorded heroes
status: Rubadiri

Pen Malawi honours Professor David Rubadiri

Opinions and Columns

Business Unpacked

Internet tax review can make data rates fall

June 9, 2021
Rise and Shine

Congrats Egenco and Engineer Liabunya

June 9, 2021
My Turn

Youth creativity and unemployment

June 9, 2021
Emily Mkamanga

Politics without principles

June 7, 2021
https://www.mwnation.com/wp-content/uploads/2021/03/WFP-Afikepo-1-2.pdf https://www.mwnation.com/wp-content/uploads/2021/03/WFP-Afikepo-1-2.pdf https://www.mwnation.com/wp-content/uploads/2021/03/WFP-Afikepo-1-2.pdf

Trending Stories

  • chakwera 3 | The Nation Online

    Malawi faces 358mw deficit

    0 shares
    Share 0 Tweet 0
  • DPP assessors Raise red flag

    0 shares
    Share 0 Tweet 0
  • Tollgate excites locals

    0 shares
    Share 0 Tweet 0
  • 1 265MT of maize rots in Admarc warehouses

    0 shares
    Share 0 Tweet 0
  • Unmasking a silent religious tourism boost

    0 shares
    Share 0 Tweet 0
  • Values
  • Our Philosophy
  • Editorial policy
  • Advertising Policy
  • Code of Conduct
  • Plagiarism disclaimer
  • Disclaimer
  • Privacy Policy
  • Terms of use

© 2021 Nation Publications Limited. All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Life & Style
    • Every Woman
      • Soul
      • Family
    • Religion
    • Feature
  • Society
  • Opinion
  • Sports
  • Chichewa
  • Enation

© 2020 Nation Publications Limited. All Rights Reserved.

Nation Online

Add
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.